General view, lab equipment

Lab specifications

Two types of R&D labs can be built in the East Building and the R&D Business Park Building.

Lab specifications

R&D Business Park Building

  • Applications
    Laboratories, laboratories, offices
  • Structure
    12 floors above ground, 1 basement floor

R&D Business Park Building

Innovation Center Building East Building

  • Applications
    Offices and laboratories for individuals aiming to start new businesses and small and medium-sized enterprises that have been in business for less than 5 years
  • Structure
    6 floors above ground, 1 basement floor

Innovation Center Building East Building

Basic structure

Innovation Center – Building East Building R&D Business Park Building
Applications Offices and laboratories for individuals aiming to start new businesses and small and medium-sized enterprises that have been in business for less than 5 years Laboratories, laboratories, offices
Structure 6 floors above ground, 1 basement floor 12 floors above ground, 1 basement floor
Lab ready

* In KSP, in principle, it is not available for bio-experiments dealing with harmful microorganisms (pathogens, etc.), experiments dealing with animals, experiments using class 1 specified chemical substances (SUCH as PCBs) stipulated in the Chemical Substances Control Law, and experiments using rad
ioactive isotopes. * The contents of the experiment will be judged after receiving a prescribed environmental examination before moving in.

Structure Steel reinforced concrete structure With little vibra
tion of 6 stories, highly rigid earthquake-resistant structure
Steel reinforced concrete 12-story struc
ture with little vibration and high rigidity
Total floor area 10,624㎡ 96,466㎡ (including underground parking lot 9,503㎡)
Floor Pvc long sheet Tile carpet (can be changed to vinyl floor, etc.)
Design load 500 kg/m² (1,000 kg/m² on the 1st and 2nd floors) 500kg/㎡
Space and capacity 1 span Approx. 77㎡ 5-span side: 492㎡ 7-span side: 690㎡
Ceiling Rock cotton sound absorbing plate (system ceiling) Rock cotton sound absorbing plate (system ceiling)
Ceiling load 25kg/㎡ 25kg/m
Ceiling height 2,700 mm (3,000 mm only on the 1st and 2nd floors) 2,700 mm (3,000 mm on the first floor only) (can store ceiling infrastructure)
Rooftop Multipurpose foundation Scrubbers can be installed Multipurpose foundation Scrubbers can be installed
Carryable dimensions L2,850mm×W1,400mm×H1,950mm L2,800mm×W1,790mm×H2,480mm
Firefighting equipment (rental room) Automatic fire alarm equipment, emergency broadcasting equipment, emergency lighting equipment, guidance light equipment, fire extinguishers, sprinkler equipment, smoke windows, fire doors Automatic fire alarm equipment, emergency broadcasting equipment, emergency lighting equipment, guidance light equipment, fire extinguishers, sprinkler equipment, smoke windows, fire doors
Elevator L2,800mm×W1,800mm× H2,450mm Load Ca
pacity: 3,200kg
For general passengers: 12 (15-20 pass
engers) Luggage transpo
rt and emergenc
y use: 4-unit luggage transport dimensions: L2,800mm×W1,900mm×H2,500mm (delivery front: W1,790mm×H2,480mm
) Load capacity: 3,200kg

Air conditioning and water supply and drainage

Support for additional air conditioning Per span: 2,700kcal/h Per square meter: 75 (kcal/h) ≥ 0.3MJ/h
Water supply, drainage and exhaust Experimental water (water supply), experimental cooling water (traffic and return), general research drainage, general exhaust, experimental exhaust Experimental water (water supply), experimental cooling water (traffic and return), general research drainage and experimental exhaust available, exclusion equipment can be installed
Water supply Per span: 39L/min Per span: 39L/min (2.3㎡/h)
Cooling water 30°C cooling water 30°C cooling water (the supply is the same as the water supply)
Heat City gas (6,000kal/h/ 1 span) ≥ 25.1MJ / h / 1 span Cold water (7°C), hot water (46°C), steam (hot water and steam for heating only) City gas (6,000kal/h/ 1 span) ≥ 25.1MJ/h / 1 span
Drainage facilities Vane for drainage installed in the rental room Vanned for drainage installed in the r
ental room (1 span to 6 spans)

Electricity and wiring

Receiving A single-phase power supply (90 W/m²) and a 3-phase electric power supply (140 W/m²) (maximum A) are permanently installed. 3Φ3W (3-phase 3-wire) 66KV……… This pre-power receiving system
Generators (2,000 KVA), storage batteries (9 sets)… Disaster prevention load response (2,000 KVA), storage batteries (9 sets)… Disaster prevention load response
Power-enabled 1Φ200/100V 90VA/m²3Φ20
0V 140VA/m² (Please con
tact us if you use above)
1Φ200/100V 90VA/m²3Φ20
0V 140VA/m² (Please con
tact us if you use above)
Indoor wiring No floor ducts Floor duct equipment (3-way system for strong electric power, information, weak electric) Take-out pitch 600 mm
Prove Hf 32W for 2 lamps Hf 32W for 2 lamps
Optical cable Each company can be drawn in Each company can be drawn in